Free shipping to Greece for orders over 600€

E-shop: 2316037000

Call Center: 2310 777000

  • Brands
    All Brands
  • Cable Terminals 3A 48mm Nickel-Red AT-0005 Krode 01.113.0091

    Product SKU: 12.13.2707

    SKU Manufacturer: 01.113.0091

    Log in to purchase

    For any information, just ask us...

    Phone customer service: +30 2316 037000

    • Description
    • Attributes

    Heavy Duty Repair Mortar R4 WRM 525 5kg Gray 2111705250

    WRM 525 is a one-component concrete repair material. It consists of cement, quartz sand, resins and special and improving admixtures. It is a non-shrinking material with excellent adhesion to concrete and resistance to frost and moisture. After mixing with water, a paste is obtained that can be applied with a trowel or metal spatula to the surface to be repaired. It is suitable for interior and exterior surfaces. It is classified as PCC R4 type repair concrete mortar, according to EN 1504-3 standard.

    Application Steps

    Step 1

    First ensure a clean surface of loose materials and corroded or carbonized concrete sections with the help of a hammer or chisel or sandblasting. Make sure that there is reinforcement to be uncovered peripherally so that the material can penetrate and roughen the concrete surfaces that will come in contact with it.

    Step 2

    Remove all residues with water under pressure and remove any excess water. It is recommended to pre-coat the substrate and the metal reinforcement with WRM 510 primer before applying the material, in order to ensure excellent adhesion of the material to the substrate. The substrate should be slightly moist

    Step 3

    In a clean container add 4.6 - 4.75 liters of clean water and gradually empty the contents of the bag (25Kg) stirring constantly, so that a homogeneous mass of mortar is obtained

    Step 4

    Allow the mixture to mature for 5 minutes and stir again for a while. It is also recommended to stir the mixture periodically for the duration of the work. After the preparation of the mixture, the additional addition of water is prohibited to correct the workability of the mortar. This will reduce its strength and increase its shrinkage

    Step 5

    Where necessary, mold the part of the concrete to be restored and then pour the repair mortar WRM 525, taking care to thoroughly lay and cover all the gaps. Make sure that all the produced air comes out and there are no gaps. The thickness of the mortar can reach up to 4 cm

    Step 6

    For uniform strength and to avoid cracks, the final surface must be kept moist for the first few days after application and quick drying must be prevented with a suitable wet cover. Special care should be taken during the summer months, and on surfaces that are under strong sun. The material should be applied when the outside temperature is between 50C and + 350C and not in the rain. When the temperature is at high levels the strengths develop faster while the workability of the material decreases. At low temperatures the resistances develop with delay. Wooden molds must be well wetted but no pools of water form

    Dimmable Όχι/No
    Lamp Socket
    Volt
    Watt
    Brightness
    Color Temperature
    Endurance

    Store network

    Find all our stores easily and quickly!

    stores

    Free pickup
    from 16 Stores

    payment

    Available
    payment methods

    shipping

    Fast delivery
    24-48 hours

    support

    TECHNOMAT
    Support

    Powered by